bostoncedar.com
dealer locator
home products about us news and events dealer login associate login
select a category
bevel in a box
clapboard
trim
cowichan gold
true gold
ti02 titanium white
azek trim
decking
latitudes decking
azek decking
outback decking
railing
trademark reserve
trademark select
latitudes railing
millwork
azek moulding
pearl interior trim
handling and installation
clapboard
quick facts
clapboard cedar ciding

© 2007 Boston Cedar & Millwork • 54 High Street • Holbrook, MA 02343 • Tel:(781) 767-3800 • E-Mail: info@bostoncedar.com
Wood Decking | Composite Decking | Cedar Siding | Interior Trim | Exterior Trim | Building Supply | Deck Railings

Clapboard Handling Instructions:

1. Product must be kept dry at all times prior to installation. Avoid ground contact.

2. Elevate the product a minimum of 6” off the ground or floor to allow for air circulation.

3. Place a vapor barrier under the unit to minimize moisture absorption.


Clapboard Installation Instructions:

1. Clapboard must be installed over dry (12% or less moisture content) framing and sheathing.

2. Clapboard should be installed over a building code approved exterior house wrap. A rain screen
2. can be an effective method in reducing potential moisture.

3. Clapboard should not be installed within 6” of the ground. Avoid direct contact against cement,
2. brick, or asphalt.

4. Any installation practice (nailing, cutting, etc.) which results in breaking of the factory coating
2. requires that the exposed areas be immediately resealed with a high quality alkyd oil primer.

5. Product must be fastened using an appropriate corrosive resistant fastener such as stainless
steel siding nails that are driven flush to the substrate surface. Avoid double nailing and sinking
the fastener head beyond the substrate flush surface. When using pneumatic fasteners, please
set pressure to make certain fastener is flush to the surface. Immediately coat fastener heads
with a high quality alkyd oil primer.

6. All avenues for water intrusion should be immediately caulked with a high performance acrylic
2. exterior caulk.

7. Avoid excessive moisture in the building. Provide building ventilation from the inside to the
outside such as continuous soffit vents and a continuous ridge vent system.

8. When applying a topcoat, follow coating manufacturing instructions. It is best to apply two coats
of top quality 100% acrylic latex paint as soon as possible but within 60 days from the original
date of siding installation.

• Clapboard must be
kept dry at all times
prior to installation.
Avoid ground contact

• Clapboard should not
be installed within 6"
of the ground. Avoid
direct contact against
cement, brick or
asphalt

• Product must be
fastened using an
appropriate corrosive
fastener such as
stainless steel siding
nails

• When applying a
topcoat, follow
coating manufacturer
instructions