Clapboard Handling Instructions:
1. Product must be kept dry at all times prior to installation. Avoid ground contact.
2. Elevate the product a minimum of 6” off the ground or floor to allow for air circulation.
3. Place a vapor barrier under the unit to minimize moisture absorption.
Clapboard Installation Instructions:
1. Clapboard must be installed over dry (12% or less moisture content) framing and sheathing.
2. Clapboard should be installed over a building code approved exterior house wrap. A rain screen
2. can be an effective method in reducing potential moisture.
3. Clapboard should not be installed within 6” of the ground. Avoid direct contact against cement,
2. brick, or asphalt.
4. Any installation practice (nailing, cutting, etc.) which results in breaking of the factory coating
2. requires that the exposed areas be immediately resealed with a high quality alkyd oil primer.
5. Product must be fastened using an appropriate corrosive resistant fastener such as stainless
• steel siding nails that are driven flush to the substrate surface. Avoid double nailing and sinking
• the fastener head beyond the substrate flush surface. When using pneumatic fasteners, please
• set pressure to make certain fastener is flush to the surface. Immediately coat fastener heads
• with a high quality alkyd oil primer.
6. All avenues for water intrusion should be immediately caulked with a high performance acrylic
2. exterior caulk.
7. Avoid excessive moisture in the building. Provide building ventilation from the inside to the
• outside such as continuous soffit vents and a continuous ridge vent system.
8. When applying a topcoat, follow coating manufacturing instructions. It is best to apply two coats
• of top quality 100% acrylic latex paint as soon as possible but within 60 days from the original•
• date of siding installation.
• Clapboard must be
• kept dry at all times
• prior to installation.
• Avoid ground contact
• Clapboard should not
• be installed within 6"
• of the ground. Avoid
• direct contact against
• cement, brick or
• asphalt
• Product must be
• fastened using an
• appropriate corrosive
• fastener such as
• stainless steel siding
• nails
• When applying a
• topcoat, follow
• coating manufacturer
• instructions