![]() |
||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||
![]() |
![]() |
![]() |
![]() |
|||||||||||||||||||||||||||
|
© 2007 Boston Cedar & Millwork • 54 High Street • Holbrook, MA 02343 • Tel:(781) 767-3800 • E-Mail: info@bostoncedar.com |
||||||||||||||||||||||||||||||
Bevel in a Box Handling Instructions:
1. Product must be kept dry at all times prior to installation. Avoid ground contact.
2. Elevate the product a minimum of 6” off the ground or floor to allow for air circulation.
3. Place a vapor barrier under the unit to minimize moisture absorption.
Bevel in a Box Installation Instructions:
1. Bevel in a Box must be installed over dry (12% or less moisture content) framing and sheathing.
2. Bevel in a Box should be installed over a building code approved exterior house wrap. A rain
• screen can be an effective method in reducing potential moisture.
3. Bevel in a Box should not be installed within 6” of the ground. Avoid direct contact against
• cement, brick, or asphalt.
4. Any installation practice (nailing, cutting, etc.) which results in breaking of the factory coating
• requires that the exposed areas be immediately resealed with a high quality alkyd oil primer.
5. Product must be fastened using an appropriate corrosive resistant fastener such as stainless
• steel siding nails that are driven flush to the substrate surface. Avoid double nailing and sinking
• the fastener head beyond the substrate flush surface. When using pneumatic fasteners, please
• set pressure to make certain fastener is flush to the surface. Immediately coat fastener heads
• with a high quality alkyd oil primer.
6. All avenues for water intrusion should be immediately caulked with a high performance acrylic
• exterior caulk.
7. Avoid excessive moisture in the building. Provide building ventilation from the inside to the
• outside such as continuous soffit vents and a continuous ridge vent system.
8. When applying a topcoat, follow coating manufacturing instructions. It is best to apply two coats
• of top quality 100% acrylic latex paint as soon as possible but within one year from the original
• date of siding purchase.
• Bevel in a Box must
• be installed over dry
• framing and
• sheathing
• Bevel in a Box should
• not be installed within
• 6" of the ground.
• Avoid direct contact
• against cement, brick
• or asphalt
• Product must be
• fastened using an
• appropriate corrosive
• fastener such as
• stainless steel siding
• nails
• When applying a
• topcoat, follow
• coating manufacturer
• instructions
• Western red cedar is
• naturally resistant to
• decay
• Biodegradable,
• environment friendly